Categories: World

1st release of treated Fukushima nuclear wastewater complete, operator says

close Video

Fox News Flash top headlines for September 11

Fox News Flash top headlines are here. Check out what’s clicking on Foxnews.com.

  • On Aug. 24, Japan began releasing treated radioactive wastewater from the Fukushima Daiichi plant as part of a decommissioning process following a 2011 earthquake and tsunami that wrecked the nuclear facility.
  • Discharging the Japanese facility, which is expected to continue for decades, has stirred massive protests from locals and neighboring countries.
  • On Monday, the operator of the Japanese nuclear facility said that the first round of the wastewater release has been completed and that the second round will begin in a few weeks.

The operator of the wrecked Fukushima nuclear power plant said Monday that it has safely completed the first release of treated radioactive water from the plant into the sea and will inspect and clean the facility before starting the second round in a few weeks.

The Fukushima Daiichi plant began discharging the treated and diluted wastewater into the Pacific Ocean on Aug. 24. The water has accumulated since the plant was damaged by a massive earthquake and tsunami in 2011, and the start of its release is a milestone in the plant’s decommissioning.

The discharge, which is expected to continue for decades until the decommissioning is finished, has been strongly opposed by fishing groups and by neighboring countries. China has banned all imports of Japanese seafood in response, hurting producers and exporters and prompting the Japanese government to compile an emergency relief fund. Groups in South Korea have also fiercely protested, demanding Japan stop the release.

JAPAN VOWS TO SUPPORT FISHERIES DURING COUNTRY’S DECADES-LONG PROCESS OF RELEASING FUKUSHIMA NUCLEAR WASTE

Prime Minister Fumio Kishida, at summits last week of Southeast Asian countries and the Group of 20 nations, stressed the safety and transparency of the release to win international support and sought the immediate lifting of China’s ban.

During the 17-day first release, the plant’s operator, Tokyo Electric Power Company Holdings, said it discharged 7,800 tons of treated water from 10 tanks. About 1.34 million tons of radioactive wastewater is stored in about 1,000 tanks at the plant.

Plant workers will rinse the pipeline and other equipment and inspect the system over the next few weeks before starting the release of the second round of 7,800 tons stored in 10 other tanks, TEPCO spokesperson Teruaki Kobashi told reporters Monday.

A group of plaintiffs and supporters over Japan’s nuclear wastewater release head to the Fukushima District Court to file a lawsuit in Fukushima, Japan, on Sep. 8, 2023.  (Kyodo News via AP)

All sampling data from seawater and fish since the start of the release have been way below set safety limits, officials said.

The International Atomic Energy Agency has been cooperating with Japan and reviewed the safety of the project. It concluded that the release, if carried out precisely as planned, would have a negligible impact on the environment, marine life and human health. On Monday, a team of South Korean experts from the Korea Institute of Nuclear Safety, under an agreement between South Korea and the U.N. nuclear agency, visited an IAEA office set up at the Fukushima plant to monitor the release and share information, the IAEA said in a statement. The South Korean team has been in Japan for the last two weeks and met with IAEA officials offsite.

CHINA CONDEMNS JAPAN’S PLAN TO RELEASE FUKUSHIMA’S RADIOACTIVE WASTEWATER INTO THE SEA

TEPCO and the government say the wastewater is treated to reduce radioactive materials to safe levels, and then is diluted with seawater to make it much safer than international standards.

The radioactive wastewater has accumulated since three of the plant’s reactors were damaged by the 2011 earthquake and tsunami. It continues to grow because cooling water used on the damaged reactors leaks into the reactor basements, where it mixes with groundwater.

CLICK HERE TO GET THE FOX NEWS APP

TEPCO plans to release 31,200 tons of treated water through March 2024, and officials say the pace will pick up later.

The government and TEPCO say the discharge is unavoidable because the tanks will reach their capacity of 1.37 million tons next year and space at the plant is needed for its decommissioning.

Share

Recent Posts

Can autonomous trucks really make highways safer?

Kodiak AI, a leading provider of AI-powered autonomous driving technology, has spent years quietly proving…

21 hours ago

Instagram password reset surge: Protect your account

If your inbox suddenly shows an Instagram "Reset your password" email you never requested, you…

1 day ago

FCC cracks down on robocall reporting violations

If you are tired of scam calls slipping through the cracks, federal regulators just took…

2 days ago

Malicious Mac extensions steal crypto wallets and passwords

Mac users often assume they're safer than everyone else, especially when they stick to official…

2 days ago

NASA returns humans to deep space after over 50 years with February Artemis II Moon mission

NASA plans to return humans to deep space next month, targeting a Feb. 6 launch…

3 days ago

5 simple tech tips to improve digital privacy

Protecting your privacy doesn’t require advanced tools or technical expertise. Some of the most effective…

3 days ago